Internal Alterations – Plas Newton, Chester
Brief: First Floor Extension & Internal Alterations
Sef and his family were looking to increase the bathrooms for their growing family and create a fresh new feeling within the property. In order to achieve this, our team began by completely stripping of the roof of the existing single storey extension, building up walls to create a new first floor bedroom and linking in roof to existing.
On the first floor a large bedroom was reduced in size to accommodate a new family bathroom so the existing bathroom could be altered to create an ensuite to the master bedroom
Taking only 14 weeks, this property refurbishment was finished in time for the Christmas period . Delighted with the final result, they commented on our exceptional attention to detail and efficient work. As you can see, the results are stunning
The finished project looks absolutely stunning thanks to its exceptionally high quality finish.